Welcome

Live steam model on 7¼" gauge of the Württembergische T3 no 924

Welcome to this blog. It will inform you about the progress of designing and building live steam model locomotives. The blog contains the description of a model Würrtembergische T3 on 7¼" gauge (built between 2006 and 2017), the wagons for this loco (built between 2018 and 2022)  and a 5" gauge model of a Great Eastern Railway Y14 class loco (started in 2020)

On the left you'll find the index where you can browse through the different articles and on the right you'll find all the extra's. On the top tabs you'll find a brief description of my other locos.

 

 

Click for the direct link to start of construction series below 
T3 7¼" steam locomotive 
 
Enjoy this site. Erik-Jan Stroetinga. The Netherlands. Europe.

 

 

 

Tuesday 25 September 2018

Ein Offener Güterwagen [type Omk, Halle O ] (part 1)

For driving the loco I'm  borrowing a 'driving truck'  (driving trolley) from a club member.  But of course I've started making my own driving truck for the T3.  I want the driving truck to look like a goods wagon. A wooden crate or box will act as load and will also function as seat for the driver. Footrests will be attached to the frame and  a hand operated braking gear will be part of the design as well.



I'm intending to build two wagons; one for driving and one for tools, firing equipment, oil cans, and other stuf  necessary for a day at the track. The superstructure will detailed and look like the real thing; the frame however will be a simplified construction, that will be strong enough to withstand a derailment, even with the driver seated on top. In my experience driving trucks on live steam model railways will have to endure some rough handling.



Offene Güterwagen   (Omk O Halle)


Foto: Slg. Freunde der Eisenbahn e.V.



I've started with a so called 'Offener Güterwagen' according to a German diagram A1 (drawings from the 'Güterwagen der Verbandsbauart' , a counterpart of the British Railway Clearing House wagon standard). These wagons were known by their telegraph code Omk  O Halle .
It was typical general purpose standard open goods wagon. The first were build during the early 1900's and they were withdrawn in the late 1950'ties. It is thought that over 60.000 were build. With a loading area of 6,7 meters long (18,4 square meters in total)  and a maximum load of 15 Tons the were used for all kind of loads that needed no protection from the weather. A small brakeman's cabin was optional, sometimes only a brake platform was available, or there was no brake gear at all.
There are many model railway suppliers that have  H0-scale and gauge 1 model wagons available. I used Märklin and Fleischmann models to take measurements and details of.



I've started with the coupling hooks, the same dimensions as of the loco hooks, but now cnc- milled.


The chamfering was done on the conventional milling machine, by tilting the milling head 2 degrees.


In the four jaw chuck, the end of the coupling hook was setup for cutting the screw-thread (Mf 6 x 0.75)  


It was cut with a die; the small fillet between the thread and shaft was made to get a smooth transition of the pulling force. (a straight edge can lead to stress points and potential cracks)


A stiff spring is used for damping the pulling power, once the train is driving on the track. For model live steam operation this simple solution is adequate. 


The buffers were the next parts to manufacture. A 6 mm steel plate was cut to length and faced and drilled in the lathe. The hole was bored with a boring tool to exact dimensions. 


Working in batches is saving some time in setting up the machine tools; so these parts were made for the two wagons.


While facing and boring out the holes on the lathe, the cnc miller was cutting the contour of the back plate.

The buffer stocks in production.

The buffer head could have been made in two parts, but I had a piece of 50 mm steel rod, that was suitable for the job. With a carbide tool and large roughing cuts it took most part of an evening to make the rear side of the 8 heads.

Waiting for the next step. The buffer shafts were glued with Loctite 601 to the back plates. 

The front side of the buffer head was turned and a small radius on the diameter finished the buffers. 

A test fitting to the buffer beam.

Holes drilled for taking up the corner pieces (made of angle steel) are located in such a way that the bolts are covered with the buffers and are thus not visible in the final buffer beam.

The shaping machine was used for getting the corner pieces square and correct length. 

The longitudinal frame members are made of 40 x 20 x 5 mm U-profile. This is the smallest size profile available; it's a little out of scale and heavy; but then again the load of the wagon (the driver) will be out of scale, so some extra strength and rigidity is welcome.  
  
The guard irons were laser cut and screwed on the frame.

The first view of the total lengt of the two wagons. 

Instead of using separate planks (as original used), I've chosen to use multiplex plywood and cut small groves with a router, for simulating the planks.

The setup for milling the groves for the side boards

Side boards at full length.

Cut to length, the side boards were glued to the floor. 

The end of wagon, opposite the brakeman's cabin, is hinged at the top and can be opened for fast emptying a load of coal is special designed tipping cradles that were use by the German railways. The complete wagon was therefore clamped and liftedSee this video 

A hinge pin is attached to this end door. 

The top hinge of the swing end door of the wagon.

Glueing the front side board on the floor. On the full scale wagons, these side board (except the one at the brakeman's cabin) where all detachable. The wagon could therefore be converted to a flat wagon. For the model this is not that practical and would get the boards easy damaged in normal use. 

The doors are folded in the plate bending machine from 1,5 mm zinc plated steel plate.

A typical pressed door appearance is created this way.

To date (end september 2018) the frame and a part of  the body assembled for testing. Still a lot of work to be done. 










Click below for direct link to start of construction series of:








Friday 25 May 2018

Spring 2018; driving the T3

The spring season is the time in the Netherlands were a lot of model engineering societies have an 'open day' or steam meeting.
With the Württembergische T3 now almost completed, we went to some of these events and had the locomotive in steam.

Here are some photos and video clips of these meetings.

Breda, Stoomgroep Zuid  (22th April)

At our club track in Breda.  


After the day putting the loco back in the car. That is different than with a 5" loco.


Den Haag, Stoomgroep West Zuiderpark  (27 until 29 April)



At the end of April we went to Den Haag. The Stoomgroep West  has a splendid track in the Zuiderpark.



Approaching the station.



Side by side with the Württembergische narrow gauge Tssd 0-4-4-0 Mallet of Ralph Peter.
Same track width  (7¼" or 184mm), but a much bigger scale.


Picking up a goods train. In the front a beautiful Baureihe 44 from a Swiss model engineer.


Even on the same scale (1:8) the T3 dwarfs against the big Br 44. 






 Pulling along a set of Dutch Railway passenger coaches.


Playing trains into the evening

With the lights on, it just looks like an electric train set of Märklin, that I had in my youth. 

Leaving the station. Although the weather was not so good, we had a great time. 



An approval of the master builder Ralph Peter Stolle. 


Barendrecht,  Maasoever Spoorweg (6th May)

Together with an excellent Dutch State Railways NS 3900 heavy express engine




Leek,  Nienoord (10 until 13 May)

Unloading at Nienoord Spoorwegen in Leek (Groningen). Every club has their own type of lift to get the loco in and out of the car. 


Nienoord has a relatively simple track through the woods. But the night time driving there is very nice. 







Blowing down the boiler after a day of driving.

Their 3½" / 5" raised track is very nice and has lovely steaming bays. So I took my 30 years old 3½"  LBSC "Mona" along as well. 



Turnhout, Stoomgroep Turnhout Belgium (19th May)

Getting the loco ready for a day at the track of Stoomgroep Turnhout, in the city park.

A lovely track with great facilities and a very nice steaming bay. 

The station is even more impressive. With 6 tracks it is very big.  

It is a scale model of the station that was used by the Belgian State Railways in Turnhout

Driving with passengers is done here on a weekly bases during the summer months. 



The track goes to the city park and has some lovely features like this suspension bridge.


Some very nice Belgian State Railways express engines next to the T3



With a load of 10 adults the loco preformed without any problems.



Passing the signal box.


Under the beautiful station roof.



At the end of the day there were some shunting duties to complete.

A BR standard class 2MT 2-6-0 is shunted into the main depot.  

Fire dropped and the loco cleaned, ready for the next meeting.